Properties
- Year of implementation: 2015
- Nature of surface: old sand surface without proper substrate
- Area: 240 m²
- Construction time: 2 days
Project description
This project consisted of the renovation of a 240 m² lunging ring. One of the main issues with the site was the total lack of stabilization and the uneven sand layer. The result: Regular lunging resulted in deep hoof marks and a hardening of the ground in the entire area.
As a first step, the old soil layer was removed from the circle area and the ground was leveled. After that, ECORASTER TE30 was installed on the surface and recovered with non-slip, shear-resistant equestrian sand.